S2-02 — Replay verification¶
Status: Ready Goal: Verify checkpoint integrity before resume.
Acceptance criteria¶
- Tampered checkpoint chains fail closed.
- Partial final writes do not hydrate.
- Resume returns typed integrity failure.
TDD plan¶
Red: tamper and partial-write tests. Green: chain verification before hydrate. Refactor: isolate replay helpers.